The Pinyon Group

Air Monitoring

AIR MONITORING

No additional hauling of contaminated soil is anticipated. All contaminated soil has been removed from the site. Air monitoring procedures were in place to maintain air quality thresholds during remedial excavation activities at the Site. Specific remedial actions are specified (such as enhanced vapor abatement or excavation shut-down) should certain conditions occur, such as elevated wind speed. Air monitoring data from the relevant periods is included below. 

Air Monitoring Data (VOCs and Dust)